Recently Completed: Route 224 Safety Improvements (Scott County)
Cost and schedule ►
The project to eliminate a sharp curve near the Route 224 bridge over the Holston River in Scott County was completed in late 2019.
Benefits
The project improves safety by eliminating a sharp curve on the heavily used commuter road between Kingsport, Tenn., and Gate City, Va.
Link to US 23/Route 224 Corridor Study
Resources
Todd Bolling, P.E., Area Construction Engineer
276-346-1913
Major funding source: Federal Funds
Phase: Recently Completed
UPC: 104189
State ID: 0224-084-S12,P101,R201,C501
Federal ID: HSIP-5102 (155)
Lat/Long: 36.612222, -82.533889
Locality:
Scott